July 23, 2013

Boeing completes 737 MAX 8 firm configuration

Boeing has completed the firm configuration of the 737 MAX 8. This milestone marks completion of the major trade studies that define the capabilities of the 737 MAX family. As detailed designs are completed and released, production can begin. Final assembly of the 737 MAX 8 is scheduled to begin in 2015 with first delivery scheduled for the third quarter of 2017. The configuration includes new LEAP-1B engines from CFM International that are optimized for the 737 MAX, a redesigned tail cone and the Boeing designed Advanced Technology Winglet to reduce fuel use. Other changes incorporated include upgrades to the flight deck displays, an electronic bleed air system and fly-by-wire spoiler flight controls.



Your Email*

Friend's Email*

Your Remark

Antispam question*
17+4=?