The Boeing Company last week delivered Europe’s first two Next-Generation 737-900ER airplanes, powered by CFM56-7B engines, to GE Commercial Aviation Services (GECAS) and its leasing customer, Spanish carrier Futura International Airways, based in Palma de Mallorca.
The 737-900ER, the newest member of the Next-Generation 737 airplane family, increases the capability of the 737 by carrying more passengers and flying farther. The European Aviation Safety Agency (EASA) certified the 737-900ER April 22. The twin-engine jet incorporates a new pair of exit doors and a flat rear-pressure bulkhead that allow a maximum capacity of 220 passengers in a single-class layout.