Final assembly of the first MRJ flight test aircraft under development by Mitsubishi Aircraft Corporation and Mitsubishi Heavy Industries got underway on October 15th, at the Komaki South Plant of MHI’s Nagoya Aerospace Systems Works located in Aichi Prefecture. The start of final assembly follows the October 13th transfer of the aircraft’s mid fuselage fabricated at the Tobishima Plant also in Aichi Prefecture. Assembly of the aircraft will progressively advance as other sections of the fuselage, main wings and other structural components arrive, after which electrical wiring, hydraulic and other systems will be installed, followed by other necessary equipment. In step with final assembly, plans call for the vertical tail and horizontal stabilizer – built at MHI’s Oye Plant in Nagoya – as well as the aircraft’s remarkably fuel-efficient cutting-edge engine – supplied by Pratt & Whitney – to be integrated to the airframe.
Learn more on how AviTrader can expand your market
Please contact
Tamar Jorssen
Vice President Sales & Marketing
+1.778.213.8543
[email protected]
Mailing Address
AviTrader Publications Corp.
Suite 305, South Tower
5811 Cooney Road
Richmond, BC V6X 3M1
Canada
[email protected]
Mailing Address
AviTrader Publications Corp.
Suite 305, South Tower
5811 Cooney Road
Richmond, BC V6X 3M1
Canada